Design, materials and approvals come first, at your pace. Day 1 is the day production starts, and 120 days later your furniture is in place.

120Days, production to delivery
5Distinct Phases
200+Projects Completed
24hResponse Time
Our Process

A process built around your confidence

Custom furniture is a significant investment, in your space, your vision, and your trust. Our 120-day process was designed to protect all three.

Every phase is defined, every milestone is communicated, and every decision is yours to approve before we move forward. You'll never wonder where your project stands.

Full TransparencyYou're updated at every phase, no surprises.
Fixed Timeline10 to 16 weeks from the day production starts, 120 days at most.
Dedicated TeamOne point of contact throughout.
Quality GuaranteeInspected before it leaves our studio.
Our Process
Every project Begins with a conversation
Phase by Phase

From first conversation to final delivery

Three steps to get every detail right, then 120 days from the start of production to your door.

01
Before Day 1

Discovery & Consultation

We begin with a deep-dive consultation (in person, virtually, or via our online form) to understand your space, lifestyle, aesthetic preferences, and functional needs. No detail is too small.

You'll receive a written project brief summarizing everything we've discussed, for your review and approval before we proceed.
Discovery & Consultation
Phase 01: Discovery
02
Before Day 1

Design & Conceptualization

Our designers develop detailed sketches, technical drawings, and 3D renderings based on your brief. We present multiple concept directions so you can see exactly how your piece will look and feel in your space.

Final Design Approval is signed at this stage. This document locks in dimensions, materials, and features: protecting both you and the project timeline.
Design & Conceptualization
Phase 02: Design
03
Before Day 1

Material Selection

You choose from a curated palette of premium materials (hardwoods, veneers, leathers, fabrics, and hardware) with guidance from our design team. Physical samples are available upon request.

A 40% deposit secures your place in our production schedule. Day 1 of your 120 days is the day production starts, once your design is approved and the deposit is received.
Material Selection
Phase 03: Materials
04
Days 1–60

Craftsmanship & Production

Day 1: your piece enters production with our master craftsmen. Each joint, finish, and detail is executed to the approved specifications. A second deposit of 30% is due once manufacturing is complete and quality inspection is passed.

Live phase tracking is available throughout production: you'll receive updates at each key milestone.
Craftsmanship & Production
Phase 04: Production
05
Days 61–120

White-Glove Delivery & Installation

Your furniture is custom-crated, shipped via climate-controlled freight, and delivered with white-glove care to your location. The remaining balance is due upon final delivery. Our team ensures perfect placement and checks every detail on arrival.

We ship internationally. International shipping includes pre-cleared customs, ISPM-15 certified packaging, and real-time tracking to your door.
White-Glove Delivery & Installation
Phase 05: Delivery
✦No Surprises

Every cost, timeline, and decision is agreed upon in writing before we proceed to the next phase.

◈Your Vision, Protected

Design approval is required at every stage. Nothing moves forward without your sign-off.

◇Built to Last

Every piece is inspected against its approved specifications before it leaves our studio.

Ready to Begin?

Start your 120-day journey today

Book a free consultation and we'll walk you through every phase: no commitment required.

Browse the pieces

Everything is made to order, your dimensions, materials and finish.